UrgentBird Island has 12–18 months before total submergence.
See the Plan
Lake Conroe Special Conservation Campaign

Bird Island Restoration Project 2026

Presented by Ripple Effect Conservation Initiative to community members, SJRA, and local partners to protect a vital Lake Conroe habitat before it vanishes.

Site Photography Credit: Lake Conroe Community
Urgent Environmental Timeline

12 to 18 Months Before Total Submergence

Google Earth annual measurements document that Bird Island has been losing an average of 0.10 acres per year due to heavy boat wave action, shoreline erosion, and fluctuating lake water levels.

What was once a thriving 4.22-acre island sanctuary in 2006 has eroded down to approximately 0.15 acres today. Without immediate shoreline stabilization, Lake Conroe will lose one of its most essential resting places for native and migratory birds.

The Time to Act is Now

Delaying restoration past 2026 will increase dredging costs exponentially and risk permanent loss of native vegetation root structures.

Google Earth Erosion Data

2005 – 2026
YearArea (Acres)Perimeter (Ft)Status
20054.041695 ftHistorical Sanctuary Peak
20064.221717 ftPeak Shoreline
20091.421183 ftRapid Severe Erosion
20122.921587 ftTemporary Silt Deposit
20170.92864 ftCritical Submergence Risk
20210.62813 ftFragmented Habitat
20230.39692 ftImminent Total Submergence
20260.15450 ftCurrent Critical State (12-18 Months Left)
Technical Scope of Work

Visual Concept: 1 Acre / 900 LF Bulkhead

Engineered for long-term stability using geomembrane geotextile lining, river riprap rock barrier walls, and dredged sediment fill.

Target Footprint

1.0 Acre

Reclaiming historical high ground to provide safe nesting above high water line.

Bulkhead Length

900 LF

Engineered perimeter barrier extending out to water depth of 4.0 feet.

Dredged Sediment

12k–15k cu yds

Material-efficient backfill configuration to build up elevation.

Protection Buffer

No-Wake Zone

Proposed vessel exclusion buffer to prevent future wave erosion.

Scope of Engineering Work & Implementation

01

Bathymetric & Topographic Survey

Establish a 50' grid pattern across the island and out into 4' water depths to pinpoint precise elevation loss and lakebed contouring.

02

Geomembrane & Riprap Wall Design

Optimize rock sizes, geotextile fabric, and anchor system for maximum wave energy absorption and long-term erosion resistance.

03

Vegetation & Habitat Planting

Introduce native aquatic plants (bulrush, cypress, duck potato) to secure backfill soil naturally and create nesting cover.

04

Long-Term SJRA Partnership

Formally coordinate with San Jacinto River Authority for lease/stewardship agreements, permitting, and annual monitoring.

Video Documentary

Conservationists: The People Protecting Texas’ Wild Places

Follow RECI Founder Madilyn Bullock out on Lake Conroe as she explains the critical erosion confronting Bird Island, the pelican resting grounds at stake, and what community action can achieve.

Help Us Save Bird Island Before It's Too Late

Your support finances engineering surveys, legal filings, public awareness, and initial shoreline construction. Together we can preserve Lake Conroe's wildlife legacy.

RECI is currently applying for 501(c)(3) federal tax-exempt status. Until our status is officially granted by the IRS, donations may not be tax-deductible. We will notify donors once tax-exempt status is confirmed.